30
Henrad SE FF
- Installation
INSTALLATION
48 GENERAL CHECKS
Make the following checks for correct operation
1. Operate the thermostat knob and check that the burner
and 'Burner on' neon, light and extinguish in response.
2. The correct operation of ANY timer and all other system
controls should be proved. Operate each control
separately and check that the main burner or circulating
pump, as the case may be, responds.
3. Water circulation system:
Note.
Fernox Superfloc, or Sentinel X300 (new systems)
or X400 (existing systems) flushing solutions should be
used during the flushing procedure. Refer to Frame 9.
49 HANDING OVER
INST
ALLA
TION
•
If an optional timer kit is fitted then refer to the instructions
supplied with the kit.
•
The temperatures quoted alongside are approximate, and
vary between installations.
a.
With the system HOT examine all water
connections for soundness.
b.
With the system still HOT, turn off the gas, water and
electricity supplies to the boiler and drain down to
complete the flushing process.
c.
Refill and vent the system, add inhibitor (see Frame
9), clear all air locks and again check for water
soundness.
Adhere the water treatment warning label, supplied
in the hardware pack, in a
prominent position on the
system, to prevent the use of incorrect water
treatment additives.
d.
Balance the system (see Frame 4).
4. Check the condensate drain for leaks and check that it is
discharging correctly
5. Finally set the controls to the User’s requirements.
Knob Setting
Flow Temperature
°C
°F
1
50
120
2
60
140
3
66
150
4
71
160
5
77
170
6
82
180
After completing the installation and commissioning of the
system the installer should hand over to the householder by
the following actions:
1. Hand the User's Instructions to the householder and
explain his or her responsibilities under the Gas Safety
(Installation and Use) Regulations 1994, amendments
1996 or rules in force.
2. Draw attention to the Lighting Instruction label affixed to
the controls pod door.
3. Explain and demonstrate the lighting and shutting down
procedures.
4. The operation of the boiler and the use and adjustment of
ALL system controls should be fully explained to the
householder to ensure the greatest possible fuel economy
consistent with household requirements of both heating
and hot water consumption.
Advise the User of the precautions necessary to prevent
damage to the system and to the building in the event of
the system remaining inoperative during frosty conditions.
5. Explain the function and the use of the boiler thermostat
and external controls.
6. Explain and demonstrate the function of time and
temperature controls, radiator valves, etc., for the
economic use of the system.
7. If any timer kit is fitted then draw attention to the Timer Kit
User's Instructions and hand them to the householder.
8. After installation, commissioning and customer hand-
over instructions please complete the
appliance log book and leave this with the customer.
9. Stress the importance of regular servicing by a CORGI
registered installer and that a comprehensive service
should be carried out AT LEAST ONCE A YEAR.
Summary of Contents for Henrad SE 30 FF
Page 1: ......