11
Mexico Super CF 3/60P - 3/140P -
Installation
5
BOILER CASING REMOVAL
INSTALLATION
INST
ALLA
TION
To install the boiler the casing MUST be removed.
6
CHECKING THE FLUEWAY BAFFLES
1.
Lift off the lower front panel.
2.
Remove 2 screws and lift off grille assembly.
3.
Remove the gas valve cover by removing the retaining
screw. Disconnect the electrical leads.
4.
Release the gas valve lead from the retaining clip.
5.
Remove the 2 screws securing the control panel and
disengage the panel by lowering and pulling it forward.
6.
Remove the 2 screws securing the top panel to
the side.
7.
Draw the top panel forward and lift it off the boiler.
8.
Remove the 2 screws securing LH side panel to
the flue collector and baseplate.
9.
Pull the panel forward, lifting it clear of the
locating peg and remove.
10.
Repeat steps 7 and 8 to remove the RH panel.
11.
The boiler is held to the packaging base by 4 M6
hex head screws. Remove the front screws,
slacken the rear screws and remove the boiler
from the packaging base.
1.
Remove the flue cleanout cover.
2. CF 3/75P, CF 3/100P & CF 3/140P only.
Ensure that the
baffles are fully inserted in the flueways.
Summary of Contents for Mexico Super CF 3/60P
Page 1: ......