Installation and Servicing
SECTION 2 - INSTALLATION
MENU OPERATION - CONT’D
PLOT GRAPHS
To plot graphs of Water Pressure,
Switch Live, DHW Flow Rate, DHW
Temperature, Flow/Return Temperature,
Flame Status, Outside Temperature or
DHW Switched Live, press MENU and
the following screen will be displayed.
EXIT
SELECT
MENU
HOT WATER PREHEAT ON / OFF
SERVICE COMPANY NAME
SHOW EFFICIENCY LEVEL
Press
MENU
SHOW EFFICIENC
Y LEVEL
HOT WATER PREHEAT ON / OFF
SERVICE COMPANY PHONE NUMBER
SERVICE COMPANY NAME
MAX
OFF
MAX
OFF
SELECT
EXIT
until the following screen is
displayed.
EXIT
SELECT
MENU
PUMP MODULATION
3 WAY VALVE MIDPOSITION
PLOT GRAPHS
Press SELECT and the following screen
will be displayed.
EXIT
SELECT
PLOT GRAPHS
CH SWITCHED LIVE
DHW FLOW RATE
WATER PRESSURE
Press
MENU
SHOW EFFICIENC
Y LEVEL
HOT WATER PREHEAT ON / OFF
SERVICE COMPANY PHONE NUMBER
SERVICE COMPANY NAME
MAX
OFF
MAX
OFF
SELECT
EXIT
and
MENU
SHOW EFFICIENCY LEVEL
HOT WATER PREHEAT ON / OFF
SERVICE COMPANY PHONE NUMBER
SERVICE COMPANY NAME
MAX
OFF
MAX
OFF
SELECT
EXIT
to highlight the desired
input and then press SELECT. A screen
similar to the following will be displayed.
EXIT
80
o
C
Flow
Return
30
o
C
0min
10min
PLOT GRAPHS
Press EXIT 3 times to end.
3 WAY VALVE MID POSITION
This feature will enable the 3 way valve
to move to midposition to allow diverter
valve removal. To access this menu the
following will be displayed.
EXIT
SELECT
MENU
HOT WATER PREHEAT ON / OFF
SERVICE COMPANY NAME
SHOW EFFICIENCY LEVEL
Press
MENU
SHOW EFFICIENC
Y LEVEL
HOT WATER PREHEAT ON / OFF
SERVICE COMPANY PHONE NUMBER
SERVICE COMPANY NAME
MAX
OFF
MAX
OFF
SELECT
EXIT
until the following screen will be
displayed.
EXIT
SELECT
MENU
PUMP MODULATION
3 WAY VALVE MIDPOSITION
PLOT GRAPHS
Press SELECT and the following screen
will be displayed.
EXIT
3 WAY VALVE MIDPOSITION
04:57
3 way valve put
into midposition
for replacement
Press EXIT to end.
2.29 GENERAL CHECKS
WATER CIRCULATION SYSTEM
1.
With the system COLD, check that the initial pressure
is correct to the system design requirements.
For pre-pressurised systems, this should be 1.0 bar.
2.
With the system HOT, examine all water connections
for soundness. The system pressure will increase
with temperature rise but should not exceed 2.5 bar.
3.
With the system still hot, turn off the gas, water and
electricity supplies to the boiler and drain down to
complete the flushing process.
Note:
A flushing solution should be used during the
flushing procedure. Flushing solutions: Fernox F3
or DS40, Sentinel X300 (new systems) or X400
(existing systems).
4.
Refill and vent the system (see Section 2.15), add
inhibitor, clear all air locks and again check for water
soundness.
5.
Reset the system initial pressure to the design requirement.
WATER TEMPERATURES
Temperatures can be selected using the CH and DHW knobs.
Knob Setting
CH Flow Temp DHW Outlet Temp
o
C (
o
F)
o
C (
o
F)
Max
80 (176)
65 (149)
Min
30 (86)
40 (104)
6.
Balance the system. Refer to Section 1.18.
7.
Check the condensate drain for leaks and check that it is
discharging correctly.
8.
Finally, set the controls to the User’s requirements.
Notes.
1. If the pump has not operated in the last 24 hours it will run
briefly to prevent seizure
2. If the diverter valve has not operated in the last 24 hours
it will be operated briefly to prevent seizure. These two
operations will not occur at the same time.