28
Viscount GTS -
Installation & Servicing
INSTALLATION
Assembling the baffle plates (for boilers supplied with
an assembled body only) in boilers supplied with an
unassembled body, the baffle plates are already in place.
• Put the baffle plates in place in the upper front flue ways,
taking care to interlock them with each other before
fitting them.
Boiler
GTS 14
GTS 15 - 19
GTS 20 - 25
Total number
of baffle
4
6
8
plates
Package no.
CM 23
CM22 + CM23
2xCM23
VIS5098
39 ASSEMBLING THE BAFFLE PLATES
• Place the cable channels so that their bevelled end is to the
front.
• Fasten with two M8 x 16 washers in the third hole
starting from the front and opposite the special nut.
• Fasten at the rear with two M8 x 16 washers
opposite the oblong holes and special nut.
VIS5101
AVANT
REAR
40 ASSEMBLING THE CABLE CHANNELS (14-17 SECTIONS)
INST
ALLA
TION