Refer to Section
3.2
Refer to Section
3.3
3
2
1. Drain the boiler.
2. Disconnect the two electrical leads from the pump.
3. Remove the 4 hex screws retaining the pump head.
4. Remove the pump head.
Be aware of water spillage.
5. Fit the new pump head.
6. Reassemble.
7. Refill the boiler.
Refer to Section
2.18
3
Refer to Section
3.2
Refer to Section
3.3
Refer to Section
2.18
52
Installation and Servicing
Section 3 - Servicing
SER
VICING
3.28 PUMP HEAD REPLACEMENT
3.27 CH WATER PRESSURE SWITCH REPLACEMENT
1. Drain the boiler.
2. Pull off the two electrical connections.
3. Using a suitable tool, pull out the metal retaining clip.
4. Carefully withdraw the pressure switch.
5. Fit the new pressure switch and reassemble. Check that
the ‘O’ ring is fitted and replace clip.
6. Refill the boiler.
3
2