50
Installation and Servicing
SECTION 3 - SERVICING
SER
VICING
3.20 PCB REPLACEMENT
Note.
Fit the earth strap provided with the PCB to your wrist and
secure to a suitable earth on the boiler chassis.
1.
Refer to Section 3.9.
2.
Ensure the control knobs are in the 12 o clock position.
3.
Carefully release the six retaining clips and remove control
box cover.
4.
Unplug all lead connections to the PCB, also where
applicable, push the small plastic clip with an electrical
screwdriver to facilitate plug removal.
5.
Spring out the four side retaining clips and pull the PCB
upwards to clear the 4 corner retaining posts.
6.
Take the new PCB.
7.
Re-connect all plug connections.
8.
Reassemble in reverse order.
9.
Turn power on, display shows:
Installer
Turn all dials
to mimimum position
Menu
Turn all dials to minimum position and the following screen
will be shown:
Installer
Initialise spare PCB?
Yes
Press “Yes” and the following screen will be shown:
Installer
Switch mains off
After 5s switch mains on
Switch mains off. After 5s switch mains on. The following
screen will be shown:
Select Boiler Model
1/4
Combi 35kW
Natural Gas
More Select
Press “More” until the desired output and gas type is
displayed, then press “Select”. The following screen will be
shown:
Installer
Program this model?
Back Yes
Press “Yes” and the model will be set and normal operation
begins. Turn the dials to the desired positions.
10.
Check that the boiler operates in both DHW and CH modes.
3
5
Plastic clip
4
4
IMPORTANT.
IT IS CRITICAL FOR SAFE
OPERATION THAT THE CORRECT BOILER SIZE
AND FUEL TYPE IS ENTERED INTO THE BOILER.