16
Installation and Servicing
Section 2 - Installation
INST
ALLA
TION
2.3 WALL MOUNTING TEMPLATE
2.4 PREPARING THE WALL
“A”
Extended centre line
155
(200)
X
Section
through wall
Side flue only
127 mm diameter hole
Rear flue only
127 mm diameter hole
Refer to Section
2.8
The wall mounting template is located on the internal
protective packaging. The template shows the position
of the fixing and rear flue centre holes for a standard
installation
Care MUST be taken to ensure the correct holes are drilled.
1.
Secure the template into the required position. Ensure it
is square by hanging a plumbline.
2.
If fitting a side flue, extend the flue centreline onto the
side by 155 mm on a standard wall fix or 200 mm if
using a stand-off bracket.
3.
Mark the following on to the wall:
a
The selected group of wall mounting screw holes.
b.
The centre position of the flue duct. Marking both the
centre and the circumference of the flue duct.
4.
Remove the template plate from the wall.
1.
Check all of the hole positions before drilling.
2.
Cut the flue hole with a 127 mm core boring tool, ensure
the hole is square to the wall.
3.
Drill the 2 mounting holes with a 7.5 mm / 8 mm masonry
drill and insert the plastic plugs provided.
4.
Locate 2 No.14 x 50 mm screws in the wall mounting plate
(one at each side, in any of the 3 holes provided at each
side) and screw home. Ensure mounting bracket is level.
2.5 FITTING THE WALL MOUNTING PLATE
2.6 MOUNTING THE BOILER
Screw the wall mounting plate to the wall using 2 wall
plugs fitted previously with the 2 screws provided.
Choose one of the 2 sets of slots in left and right bank.
Ensure that at least one of the screws is fitted into a top
slot and the mounting bracket is level.
esp9496
Example of fixing
1. Lift the boiler onto the wall mounting plate and locate it
over the 2 tabs.
WARNING:
Ensure that, during the cutting operation,
masonry falling outside of the building does not cause
damage or personal injury.