INSTALLATION
Mini
--- Installation & Servicing
28
32 GENERAL CHECKS
Make the following checks for correct operation:
1 Hot water (
Mini C24
,
Mini C28
and
Mini C32
models).
a.
Fully open all DHW taps in turn and ensure that water flows
freely from them.
b.
Close all taps except the furthest one from the boiler and
check that the boiler is firing at maximum rate.
c.
Ensure that DHW temperature of approximately 35
˚
C rise
is obtained at the tap. This corresponds to a flow rate of about
10.0 (2.2) l/min (gpm)
Mini C24
11.6 (2.6) l/min (gpm)
Mini C28
13.1 (2.9) l/min (gpm)
Mini C32
d.
Turn off the DHW tap.
2 Central heating (all models)
Operate each control separately and check that the main
burner or circulating pump, as the case may be, responds.
3 Gas rate --- G20
Check the boiler gas rate when the boiler is at full output.
The gas rate will normally be
47.0 (1.66) litres/min (ft
3
/min) for the models
Mini C24
and
Mini S24
54.8 (1.94) litres/min (ft
3
/min) for the models
Mini C28
and
Mini S28
62.2 (2.20) litres/min (ft
3
/min) for the model
Mini C32
checked at the gas meter, with no other appliance in use.
If this check is not possible, ensure that the burner pressure
is:
11.7 (4.7) mbar (in. w.g.) for all models.
4 Water circulation system
Note. Fernox Superfloc flushing solution should be used
during the flushing procedure.
a
.
With the system HOT examine all water connections for
soundness.
b.
With the system still HOT, turn off the gas, water and
electricity supplies to the boiler and drain down, to complete
the flushing process.
c.
Refill the system, adding inhibitor (see ’Water Treatment’), if
required.
Vent as necessary to clear all air and, again, check for water
soundness. After venting, repressurise as required.
d.
Balance the system. It is suggested that, initially, all radiator
handwheel valves (or TRVs if fitted) be set fully open, that all
lockshield valves be set a half---turn open.
Make minor adjustments to each radiator to achieve the same
differential on all.
5 Flue system
Check the integrity of the flue outlet and air inlet system to the
boiler ensuring no leaks are evident from piping joints or
flue/air sampling points.
Finally, set the system controls to the users requirements.
If an optional programmer kit is fitted refer to the instructions
supplied.