8
Buccaneer GT, Falcon GTE
- Installation, Assembly & Servicing
3
ASSEMBLY
3.1 BUCCANEER GT COMBINATION BOILER
ASSEMBLY
Packaging
: the tables below show the numbers of the packages
which make up the boiler. The packages are listed in the order in
which they are opened for assembly.
Tools required
:
- Phillips head screwdriver
- Wide flat screwdriver
- 13mm spanner
Boiler
3
4
5
Boiler
Body
Jacket
Pack
Control Panel -
Standard
Domestic Hot
Water Sensor
Domestic Hot
Water Tank
- MLS 150
Hydraulic
Boiler-to-Tank
Connection Kit
IC1
IC2
IC3
IC4
IC5
IC6
IC7
IC7
IC7
AD127
AD127
AD127
BH 59
BH 59
BH 59
BH 46
BH 46
BH 46
1.
See the assembly instruction supplied with burner.
2.
See the technical instructions for sensor connection. The assembly of any optional devices purchased with the boiler is described
in the instructions supplied with the relevant device or in the control panel instructions. The list of available optional devices is
provided in the applicable price list.
*7+#'
*7+#"
*7+##
*7+#$
*7+#%
*7+#&