12
Concord ESi
- Installation and Servicing
INSTALLATION
8
ASSEMBLY
Tools required:
1
8-mm spanner
1
10-mm spanner
1
13-mm spanner
1
19-mm spanner
1
Phillips head screwdriver
1
* Simplified JD assembly tool (8 to 14 sections)
or 1
* JD-TE assembly tool for any model
or 1
* JD-TE Plus assembly tool for any model
* Not supplied with the boiler
Packaging: the tables below provide the numbers of the packages making up the boiler.
The packages are listed in the order in which they are to be opened during assembly.
ESi140
Type of Boiler
ESi160
ESi180
ESi200
ESi220
ESi260
ESi300
ESi340
ESi380
GK 100
Boiler body:
GK 101
GK 102
GK 103
GK 104
GK 105
GK 106
GK 107
GK 108
- Gas train package
+ base frame
+ combustion chamber
Left-hand side sect.
8358-0003
Intermediate sect.
8358-0001
Right hand side sect.
8358-0002
Set of two
tie rods
Package of unassemb-
led body accessories
Draught diverter
package
Casing & insulation
package
Control panel
BOILER WITH UNASSEMBLED BODY
1
6
1
1
7
1
1
8
1
1
9
1
1
10
1
1
12
1
1
14
1
1
16
1
1
18
1
8350-
7121
8350-
7122
8350-
7123
8350-
7124
8350-
7125
8350-
7126
8350-
7127
8350-
7128
8358-
7074
GD 12
GD 32
GK 109
GK 1
GD 13
GD 33
GK 110
GK 1
GD 14
GD 34
GK 111
GK 1
GD 15
GD 35
GK 112
GK 1
GD 16
GD 36
GK 113
GK 1
GD 17
GD 37
GK 114
GK 1
GD 18
GD 38
GK 115
GK 1
GD 19
GD 39
GK 116
GK 1
GD 20
GD 40
GK 117
GK 1
con9048
INST
ALLA
TION