16
Concord ESi
- Installation and Servicing
INSTALLATION
con9067
16 ASSEMBLY RODS
18 ASSEMBLING THE PIPING
-
Fit the tie rods with M10N washers and H10 nuts.
-
Remove the assembly tool.
-
Remove the central front foot.
CON5264
-
Fasten the 16 M12 studs supplied in the accessories
package onto the side sections connections, taking
care to screw the short thread of the studs in the cast
iron.
-
Fasten the flow pipe, the return pipe, the threaded flange
and the plain flange (4 H12 nuts and 1 seal for each pipe or
flange).
All hydraulic connections must be carried out on the
same side (either on the right-hand side or on the left-
hand side), but never diagonally.
-
The pocket must in all cases be placed on the left-hand
side of the boiler.
-
If the flow and the return are on the left-hand side: put the
pocket in the flow pipe opening and the 1/2" plug in the
threaded flange.
-
If the flow and return are on the right-hand side: put the
pocket in the threaded flange and the 1/2" plug in the flow
pipe opening.
Flow and return pipes mounted on the
left-hand side of the boiler
Flow and return pipes mounted on the
right-hand side of the boiler
17 SYSTEM CONNECTIONS
con9066
INST
ALLA
TION