Concord ESi -
Installation and Servicing
19
INSTALLATION
3
4
1
2
5
CON5270
23 JACKET SUPPORTS
24 INSULATION ASSEMBLY
-
Mount angle (1) (supplied in the casing package) on front
support (2) and fasten it using the premounted self-tapping
screws.
-
Fasten the front support using 2 M8 x 25 2 nuts +
4 large-diameter washers.
-
Put the 3 cable ties (4) in place on the control panel
support.
-
Stick the data plate (5) on the front support.
-
Insert the rear insulation panel
between the boiler body and the
draught diverter. Insert the bottom of
the panel into the retaining slot.
Note
Black insulation fabric on the outside.
con9049
INST
ALLA
TION