background image

Page 3

TO SHUT DOWN A MULTI-MODULE BOILER

1.

 

For short periods:

  Turn off the electricity supply to the boiler.
2.  For longer periods:
  Turn OFF the mains electricity supply.
  Turn OFF all module gas service taps.
  Turn OFF the main inlet gas tap.
  Turn water and all system controls to OFF.

FROST WARNING

If frost is likely during a short absence, leave the 

boiler running. 
For longer periods, unless the controls include a 

frost thermostat, the system should be drained. 

MAINTENANCE

IMPORTANT

In order to ensure safe and reliable operation of 

Ideal Concord Super 

boilers it is essential that 

regular maintenance be carried out by a competent 

staff who have received instruction in maintenance, 

fault finding and commissioning procedures for this 

boiler series.  

1.  Towels etc., MUST NOT be draped over the 

boiler case. 

2.  The user MUST ensure that the boiler-house is 

maintained in a clean and tidy condition and that 

NO loose items can fall onto the boiler. 

  The boiler should NOT be operated during the 

course of building, painting, piping or lagging 

work etc., in the boiler-house. 

  When such work is in progress, the modules 

should be covered by means of clean dust 

sheets. 

3.  The passage of combustion and ventilation air to 

the boiler MUST NOT be restricted. 

4.  The boiler-house MUST NOT be used for 

storage purchases. 

5.  Flammable materials MUST NOT be stored on 

or near the boiler. 

ESCAPE OF GAS

DO NOT search with a NAKED flame. 

Should a gas leak be suspected, contact your local 

gas region without delay. 

Summary of Contents for CONCORD SUPER SERIES 4

Page 1: ...n be assured conform to the safety and performance specification that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of literature for specification and maintenance practices visit our website www idealcommercialboilers com where you can download the relevant information in PDF format July 2018 UIN 100921 A03 ...

Page 2: ...the fan will start and run for approximately 15 seconds c At the end of this period the ignition cycle will commence The ignition electrode will spark to the burner the gas valves will open and the burner will light The Burner On light will be illuminated d The burner will continue to fire until the thermostat is satisfied The gas supply to the burner will then be cut off and the fan will stop The...

Page 3: ... have received instruction in maintenance fault finding and commissioning procedures for this boiler series 1 Towels etc MUST NOT be draped over the boiler case 2 The user MUST ensure that the boiler house is maintained in a clean and tidy condition and that NO loose items can fall onto the boiler The boiler should NOT be operated during the course of building painting piping or lagging work etc i...

Page 4: ...l HU5 4JN Tel 01482 492251 Fax 01482 448858 Registration No London 322 137 Ideal Technical Helpline 01482 498376 www idealcommercialboilers com Ideal Boilers Ltd pursues a policy of continuing improvement in the design and performance of its products The right is therefore reserved to vary specification without notice ...

Reviews: