27.08.2018
105 / 136
EVO S -
Installation and Servicing
E. ELECTRICAL AND HYDRAULIC VALIDATION
Line No. Value
• Input/output test
menu
Check the outputs
Pump with 0-10 V control
Output test Ux (7716/7724)
in % (1% = 0,1 V)
9.4.3.
Controlling a DHW pump Q3
D. SPECIFIC START-UP PROCEDURE
Line No. Value
• Configuration
menu
Case of a 0-10V command DHW pump.
Configure the DHW pump Q3.
Function output Ux (6078/6089)
Pompe ECS Q3
Signal direction.
Progress of the 0-10V signal in the signal
increase direction for speed increase.
Signal logil output UX (6079/6090)
Standard
• DHW storage tank
menu
Set these 3 parameters to the same value
Pump speed min (5101)
between 0 and 100 %
Pump speed max (5102)
between 0 and 100 %
Starting speed charg pump (5108)
between 0 and 100 %
E. ELECTRICAL AND HYDRAULIC VALIDATION
Line No. Value
• Input/output test
menu
Check the outputs
Pump with 0-10 V control
Output test Ux (7716/7724)
in V (1% = 0,1 V)