20 / 136
00RNO0333-B (U0625869)
EVO S -
Installation and Servicing
4.2.
Removing / installing the front panels
Pull the bottom of the panel forwards to release.
Pull the top of the panel forwards to release.
Remove the panel.
Do the opposite to install the panel.
figure 6 -
Removing the trim doors
U0561516-#
4.3. Exhaust connection
You must comply with the regulatory texts and rules of the art that apply in
the country where the boiler will be installed.
The exhaust extraction ducts must be made in a material resistant to the
condensate that can form when the boiler is operating.
These materials
must also be capable of supporting flue gas temperatures up to 120°C.
One exhaust temperature sensor guarantees the protection of the type
B and C combustion product evacuation ducts.
EVO S boilers are approved to be connected to:
•
a B23 or B23P flue
• a C13 or C33 suction pipe
IMPORTANT:
The boiler must not be made to support the exhaust duct's weight.