54 / 136
00RNO0333-B (U0625869)
EVO S -
Installation and Servicing
Single boiler
2 regulated circuits, 1 direct circuit with low limit and
production of DWH
Diagram
VF3
page 1 / 7
A. HYDRAULIC DIAGRAM
figure 24 -
VF3 diagram
B. REGULATION ACCESSORY REQUIRED
Quantity
Appliance reference
Order No.
Extension module kit (delivered with a
network sensor QAD 36)
2
AGU 2.550
219483
DHW sensor kit
1
QAZ 36
219481
Output sensor kit
1
QAC 34
219479
Room sensor kit
1
QAA 75
040954
The water law of the heating circuit is programmed on the NAVISTEM B3000 with a weekly heating
programme.
The AGU 2.550 interfaces built into the boiler are used to control the two three-way regulating valves of
the heating networks.
The boiler operates in variable flow temperature according to the outdoor temperature measured by the
exterior sensor QAC 34, without a low temperature limit.
The production of domestic hot water is controlled by the NAVISTEM B3000 using the QAZ 36 sensor in
the tank.