2.2 PACKAGING REMOVAL
2.3 UNPACKING
The boiler is supplied fully assembled in one pack.
When unpacking the boiler check the contents against the items below.
Do not dispose of the packaging until all contents are accounted for, as some parts are held within the cardboard packing pieces.
1. The boiler should be laying on its back with
the straps removed.
2. Carefully read the installation instructions
before proceeding.
3. Remove the outer packing sleeve.
4. Remove the protective cardboard wall
mounting template from the front of the
boiler.
5. Remove the packing piece from the top of
the boiler.
6. Check the contents against the list in
Section 2.3 ‘Unpacking’. Note: some items
are contained within the top packing piece.
7. The boiler may now be stood on its base,
with the cardboard bottom packing piece
still in place to protect the connections.
Due care should be taken when standing
up the boilers, with respect to their
weights, see Table 2 on page 6.
x6
x6
x2
x1
x1
x1
x1
x1
x1
x1
x1
x1
x1
Boiler
Connector Kit
Wall Mounting Bracket
Wall Mounting Template
Installation Guide
User Guide
Log Book
Warranty
Grommet
Hex Head Coach Screws
Wall Plug
Condensate Trap
Gas Cock
7
3
4
5
15
Installation & Servicing
SECTION 2 - INSTALLATION
INST
ALLA
TION
Summary of Contents for EVOMAX 2 30
Page 4: ...4 Installation Servicing...
Page 75: ...75 Installation Servicing NOTES...
Page 76: ...76 Installation Servicing NOTES...
Page 77: ...77 Installation Servicing NOTES...
Page 78: ...78 Installation Servicing NOTES...