2.28
CONTROLS CONFIGURATION, COMMISSIONING AND TESTING
A.
ELECTRICAL INSTALLATION
1. Checks to ensure electrical safety should be carried out
by a competent person.
2. ALWAYS carry out the preliminary electrical system
checks, i.e. earth continuity, polarity, resistance to earth
and short circuit, using a suitable meter.
WARNING.
Whilst effecting the required gas soundness test and purging air from the gas
installation, open all windows and doors, extinguish naked lights and DO NOT SMOKE.
TO QUALIFY FOR FREE COMMISSIONING, BOILERS MUST BE COMMISSIONED WITHIN 3 MONTHS OF INSTALLATION.
TO ARRANGE COMMISSIONING REFER TO CONTACT DETAILS ON BACK PAGE.
B. GAS INSTALLATION
1. The whole of the gas installation, including the meter,
should be inspected and tested for soundness and then
purged in accordance with the recommendations of the
relevant standards listed on page 8, by the installer.
In IE refer to I.S.813:2002.
Connecting Multiple Room Sensors
Connecting
Multiple
Room
Sensors
One
Two
Three
Four
Note.
Where
multiple
sensors
are
used
the
overall
accuracy
of
temperature
measurement
is
reduced,
this
can
be
compensated
for
by
trimming
the
parallel
resistors
Siting
of
multiple
room
sensors
for
large
spaces
should
be
carefully
considered
to
avoid
significant
temperature
differences
between
sensors
Sensor
1
Sensor
3
Sensor
3
Sensor
4
Sensor
2
10k
Ω
1%
0.25W
Sensor
3
Sensor
1
10k
Ω
1%
0.25W
10k
Ω
1%
0.25W
Sensor
1
Sensor
1
Sensor
2
35
Installation & Servicing
SECTION 2 - INSTALLATION
INST
ALLA
TION
Summary of Contents for EVOMAX 2 30
Page 4: ...4 Installation Servicing...
Page 75: ...75 Installation Servicing NOTES...
Page 76: ...76 Installation Servicing NOTES...
Page 77: ...77 Installation Servicing NOTES...
Page 78: ...78 Installation Servicing NOTES...