12
FP14KC-X
JAN 2023
7)
Route specific cable ends
‘down & around’ each crossbeam cable pulley and up, making sure cables
are not crossed inside crossbeams,
Fig. 8
.
Fig. 8
8)
Bolt the front of runways with wheel stops onto the front crossbeam by aligning the two holes in the top
of the front crossbeam tube with the slots in the runway end plates and the holes in the front wheel stops.
Secure runway & wheel stop to the crossbeam using four
M12 x 40mm
hex flange bolts,
Fig 9
.
Fig. 9
9)
Bolt the rear of runways onto the rear crossbeam by aligning the holes in the top of rear crossbeams
tube, secure using four
M12 x 30mm
hex flange bolts.
NOTE:
The Offside Side Runway can be mounted to the Crossbeams in two positions for either
narrow or standard width configurations. Standard width is highly recommended.
Lift Cable
M12 x 40mm
Hex Flange Bolts
Wheel Stop
Front
Crossbeam
Cable
Pulley