16
FP14KC-X
JAN 2023
Step 5: Power Unit & Control Bracket Installation
NOTE:
There are two positions for mounting Power Unit & Control Bracket - Side of Post or
Front of Post. Choose the desired position that best fits the service bay area. (Fig. 20)
1)
Carefully remove Power Unit from the package and mount to the Main Side Post bracket using
M8 x
25mm
Bolts, Washers & Hex Nuts, keeping the left side slightly loose to mount Control Bracket,
Fig. 21.
CAUTION!
Due to the top heavy weight of Power Unit, an extra person is recommended to
assist with mounting to the Main Side Post Bracket.
Fig. 20
Fig. 21
2)
Mount Control Bracket to the backside of the Main Side Post Bracket
’s left side while using the same
M8 x 25mm
Bolts, M8 Washers & Hex Nuts to mount the Power Unit,
Fig 20
. Ensure to tighten all Bolts
to fully secure Power Unit & Control Backet to Main Side Post.
3)
Mount Air Valve and the Air Inlet
‘quick disconnect’ Fitting to the holes in the Control Bracket, as
shown in
Fig. 22
.
Fig. 22
4)
Remove Breather / Fill Cap to add Hydraulic Oil (SAE-10, AW 32) to Power Unit Reservoir Tank, Add
to Min. fill line on Drip Stick, approx.13 to 14 quarts,
Fig. 22
.
Do Not Use ATF!!
Side of Post
Position
(As Shown)
(OR)
Front of Post
Position
M8 x 25mm
Bolt, Washer & Nut
Main Side Post
Control Bracket
Air Valve
(Push Button)
Air Inlet Fitting
Breather / Fill Cap
w/ Drip Stick
Reservoir
Tank