background image

30 

FP14KC-X 

JAN 2023

 

Parts List (Structure)

 

ITEM 

Tux P/N 

M-REF P/N 

DESCRIPTION 

QTY 

FP14KCX-001 

TT-8861-200-00A-HJ 

Main Post w/ PU Bracket 

FP14KCX-002 

TT-8861-200-00B-HJ 

Sub Post 

FP14KCX-003 

TT-8861-100-00A-HJ 

Crossbeam (Front) 

FP14KCX-004 

TT-8861-300-00A-HJ 

Main Side Runway 

FP14KCX-005 

TT-8861-300-00B-HJ 

Off Side Runway 

FP14KCX-006 

TT-8861-100-00B-HJ 

Crossbeam (Rear) 

FP14KCX-007 

TT-8861-400-00-HJ 

Ramp 

7.1 

FP14KCX-007.1 

TT-8136J-500-01 

Warning Strip Ramp 

7.2 

FP14KCX-007.2 

GB818-2000 M6*12 

Screw, M6 x 12mm 

FP14KCX-008 

TT-8861-300-10-01 

Wheel Chock 

FP14KCX-009 

TT-8861-300-11 

Wheel Stop (FP14KCX) 

10 

FP14KCX-010 

GB/T5789-1986  M12X40 

Flange Bolt, M12 x 40mm 

11 

FP14KCX-011 

GB/T5789-1986  M12X30 

Flange Bolt, M12 x 30mm 

12 

FP14KCX-012 

TT-8861-300-10-02 

Rubber Base 

13 

FP14KCX-013 

GB95-1985 D5 

Flat Washer, D5 

16 

14 

FP14KCX-014 

GB818-2000 M5x20 

Screw, M5 x 20mm 

16 

15 

FP14KCX-015 

GB6170-2000 M5 

Nut, M5 

16 

16 

FP14KCX-016 

TT-8861-400-02 

Ramp Pivot Pin 

17 

FP14KCX-017 

GB/T91-2000  5X40 

Cotter Pin, 5mm x 40mm 

18 

FP14KCX-018 

TT5D-400-02 

Nylon Roller 

19 

FP14KCX-019 

GB894.1-2000 D16 

Circlip, D16 

20 

FP14KCX-020 

GB6170-2000 M20 

Nut, M20 

21 

FP14KCX-021 

TT-8861-200-01-HJ 

Latch Rack 

22 

FP14KCX-022 

GB95-1985 D8 

Flat Washer, D8 

23 

FP14KCX-023 

GB70.1-2000 M8*12 

Screw, M8 x 12mm 

24 

FP14KCX-024 

TT-8861-100-01B-HJ 

Slack Cable Latch (LH) 

25 

FP14KCX-025 

TT-8861-100-01-05 

Slack Cable Roller 

26 

FP14KCX-026 

GB894.1 D10 

Circlip, D10 

27 

FP14KCX-027 

TT-8861-100-01-06 

Spring 

28 

FP14KCX-028 

TT-8861-100-01-07 

Latch Pin 

29 

FP14KCX-029 

TT-8861-100-01-08 

Pulley Shaft (Crossbeam) 

30 

FP14KCX-030 

TT-8861-100-01-09 

Nylon Spacer 

31 

FP14KCX-031 

TT-8861-100-01-10 

Shaft Lock Plate (Crossbeam) 

32 

FP14KCX-032 

TT-8861-100-01-11 

Latch 

33 

FP14KCX-033 

GB95-1985 D20 

Flat Washer, D20 

12 

34 

FP14KCX-034 

TT-8861-100-01-12 

Rubber Grommet (Crossbeam) 

35 

FP14KCX-035 

GB/T91-2000  3.2X40 

Cotter Pin, 3.2mm x 40mm 

36 

FP14KCX-036 

GB5783-2000 M10X16 

Bolt, M10 x 16mm 

37 

FP14KCX-037 

GB93-1987 D10 

Lock Washer, D10 

38 

FP14KCX-038 

MTAL 16X50 

Air Cylinder, 16mm x 50mm 

39 

FP14KCX-039 

TT-8861-100-01-13 

U-Bracket 

40 

FP14KCX-040 

GB6170-2000 M6 

Nut, M6 

41 

FP14KCX-041 

GB889.1-2000 M6 

Lock Nut, M6 

42 

FP14KCX-042 

TT-8861-100-01-14 

Pin 

43 

FP14KCX-043 

GB/T91-2000 1.6X20 

Split Pin, 1.6mm x 20mm 

44 

FP14KCX-044 

GB5783-2000 M6X30 

Bolt, M6 x 30mm 

45 

FP14KCX-045 

GB95-1985 D6 

Flat Washer, D6 

46 

FP14KCX-046 

TT-8861-100-01-17 

Slider 

47 

FP14KCX-047 

TT-8861-100-01-16 

Cable Pulley (Crossbeam) 

48 

FP14KCX-048 

TT-8861-100-01-18 

Plastic Crossbeam Cover 

Summary of Contents for FP14KC-X

Page 1: ...hicle Lift 14 000 lb Capacity Installation Operation Manual IMPORTANT READ THIS MANUAL THOROUGHLY BEFORE INSTALLING OPERATING OR MAINTAINING THIS LIFT WHEN DONE WITH INSTALLATION BE SURE TO RETURN DOC...

Page 2: ...lation Instructions Pages 9 21 Lift Location Runway Crossbeam Post Crossbeam Anchoring Posts Power Unit Control Bracket Hydraulic Hose Airline Power Unit Electrical Connection Cycle Testing Bleeding H...

Page 3: ...ould not wear loose clothes to avoid being clamped by any moving part when the machine is descending or rising Area around the lift must be kept clean to help avoid accidents and possible lift malfunc...

Page 4: ...on Lift Description The iDEAL FP14KC X 14 000 lb Four Post Commercial Service Lift is a high performance closed front cable pull vehicle lift designed for Cars SUVs Vans Trucks The FP14KC X Service Li...

Page 5: ...5 FP14KC X JAN 2023 Lift Layout Fig 1...

Page 6: ...r trailer The four post lift package alone weighs close to 2 700 pounds not including any kits or optional accessories that may be included Un banding the Lift The steel bands which secure the lift pa...

Page 7: ...where the lift is to be installed and check for cracked or defective concrete This lift must be installed on a solid level concrete floor with no more than 2 degrees of slope A level floor is suggeste...

Page 8: ...anchors typically 2 to 3 weeks Anchoring Tips 1 Use a concrete hammer drill with a carbide tip solid drill bit the same diameter as the anchor 3 4 775 to 787 inches diameter Do not use excessively wor...

Page 9: ...e adequate clearance around the lift s outer perimeter for safety clearance as shown in Fig 3 Ensure concrete floor is level meets Foundation Anchoring Requirements on Page 8 NOTE The Main Side Power...

Page 10: ...ay making sure the hydraulic hose connection is positioned to the front of bay Fig 4 Fig 4 2 Pull cable ends air tubing and hydraulic lines out from the ends of the Main Side Runway for assembly Ensur...

Page 11: ...aside for reassembly in the follwing steps Fig 6 6 Slide the cables from the ends of power side runway and route the cables though the crossbeams referring to the routing diagram in Fig 7 Fig 7 CAUTI...

Page 12: ...s and the holes in the front wheel stops Secure runway wheel stop to the crossbeam using four M12 x 40mm hex flange bolts Fig 9 Fig 9 9 Bolt the rear of runways onto the rear crossbeam by aligning the...

Page 13: ...inserted through the outer top plate hole for each Post 4 Carefully position each Post to be centered around the Crossbeam ends while still allowing the Nylon Slider bolt holes to stay exposed Bolt S...

Page 14: ...the Slack Cable Roller 7 Locate the Plastic Crossbeam Covers and mount to the top of each Crossbeam ends using the Plastic Insert Screws Fig 14 8 Re install Cable Guide Tabs to the underside of each...

Page 15: ...are damaged or if the lift will need to be relocated 3 After drilling remove dust thoroughly from each hole using compressed air and or wire brush Make certain that the column remains aligned with the...

Page 16: ...t Fig 20 Fig 21 2 Mount Control Bracket to the backside of the Main Side Post Bracket s left side while using the same M8 x 25mm Bolts M8 Washers Hex Nuts to mount the Power Unit Fig 20 Ensure to tigh...

Page 17: ...h Corrugated Flex Tubing already attached Gently pull hose slack through the Flex Tubing Figs 23 24 Fig 23 Fig 24 4 Install 90 degree Power Unit Fitting to HP Port on left side of Power Unit shown in...

Page 18: ...rt A Figs 27 A B Fig 27 8 Connect D6 Airline to the Outlet Valve Port P and route through Flex Tubing to connect to T Fitting Connect airlines to each end of T Fitting then connect to Y Fittings in Cr...

Page 19: ...220VAC electrical supply to Power unit and connect shop air to Quick Disconnect Air Fitting on Control Bracket Ensure shop air supply to Air Fitting is between 90 115 PSI for proper Latch operation F...

Page 20: ...to the outside of the Runway Pivot Tubes Fig 31 Cable Leveling Adjustment 2 Adjust cable s with lift fully lowered and with Crossbeams touching Base Plates Loosen top jam nut and tighten nut on cable...

Page 21: ...tment nuts on cable end or latch bar stud always leave at least two threads showing between top nut and stud end Be sure all four corners have passed the locking latch bar slot before lowering lift on...

Page 22: ...capacity Never allow unauthorized persons to operate lift Thoroughly train new persons employees in the use operation and care of lift Prohibit unauthorized persons from being in shop area while lift...

Page 23: ...t the latches set tight in a lock position Never work under a lift that is not in the locked position at all four corners of lift WARNING Always have the Lift in the Locked Position before going under...

Page 24: ...her of Power Unit 1 Oil reservoir tank overfilled Relieve all pressure and siphon out hydraulic fluid until at a proper level 2 Lift lowered too quickly while under a heavy load Lower the lift slowly...

Page 25: ...1 Locate the check valve the flush plug to the left of the lowering valve Step 2 Using an Allen wrench and shop towel with shop towel in place to catch fluid loosen the check valve plug 2 turns to al...

Page 26: ...sually while in operation Check safety latches for free movement and full engagement with latch rack Check hydraulic connections and hoses for leakages Check cables anchoring connections for cracks an...

Page 27: ...27 FP14KC X JAN 2023 Exploded Views Structure...

Page 28: ...28 FP14KC X JAN 2023...

Page 29: ...29 FP14KC X JAN 2023...

Page 30: ...021 TT 8861 200 01 HJ Latch Rack 4 22 FP14KCX 022 GB95 1985 D8 Flat Washer D8 4 23 FP14KCX 023 GB70 1 2000 M8 12 Screw M8 x 12mm 4 24 FP14KCX 024 TT 8861 100 01B HJ Slack Cable Latch LH 4 25 FP14KCX 0...

Page 31: ...072 GB70 2 2000 M10X25 Screw M10 x 25mm 4 73 FP14KCX 073 TT 8861 300 09 Rubber Grommet Runway 2 74 FP14KCX 074 GB T91 2000 5X40 Split Pin 5mm x 40mm 1 75 FP14KCX 075 8045 401G Cylinder Connector 1 76...

Page 32: ...32 FP14KC X JAN 2023 Exploded View Power Unit PU 220V FP14KCX...

Page 33: ...200 E00 Reservoir Fill Cap 1 19 PU 220V FP14KCX 019 5901 01120 355 O Ring D112 x 3 55mm 1 20 PU 220V FP14KCX 020 5105 08080 000 Hex Socket Bolt M8 x 80mm 2 21 PU 220V FP14KCX 021 BZ01 00001 100 Return...

Page 34: ...considered a warranty issue and therefore must be noted for any potential recovery with the shipping company The customer is required to notify Tuxedo of any missing parts within 72 hours Timely notif...

Reviews: