6
FP14KC-X
JAN 2023
Main Lift Components:
1.
Main Side Post (w/ Power Unit Mounting Bracket)
2.
Power Unit (w/ Start Up Button & Manual Release Valve Lever)
3.
Main Side Runway (w/ Hydraulic Cylinder Underside)
4.
Off Side Runway
5.
Sub Posts
6.
Crossbeams (Front & Rear)
7.
Approach Ramp
8.
Wheel Stop (Service Lift)
9.
Air Control Bracket (w/ Latch Release Air Valve & Button)
10.
Wheel Chocks
Fig. 2
Receiving & Handling:
Unloading the Lift:
You will need a forklift that can handle about 4,000 to 5,000 pounds and
operates on a smooth surface to unload from freight carrier trailer. The four post lift package alone
weighs close to 2,700 pounds, not including any kits or optional accessories that may be included.
Un-banding the Lift:
The steel bands which secure the lift parts to the lift package are heavy duty.
You will need a pair of metal shears or tin snips to cut the steel banding. Be very careful cutting
bands, as they will tend to fly apart when cut, along with possible shifting of heavy lift parts when
freed from the bands. Stand to the side of bands when cutting, while using gloves & safety glasses.
Moving Lift Components:
Recommend moving larger lift components to the garage or service
bay with the forklift, dolly and/or engine hoist. Smaller pieces can typically be moved by one or two
people.
FRONT
REAR