34
Installation and Servicing
SECTION 2 - INSTALLATION
2.21 COMMISSIONING AND TESTING
GENERAL
Please Note
: The combustion for this appliance has
been checked, adjusted and preset at the factory for
operation on the gas type defined on the appliance
data plate.
DO NOT
adjust the air/gas ratio valve.
Having checked:
- That the boiler has been installed in accordance
with these instructions.
- The integrity of the flue system and the flue seals,
as described in the Flue Installation section.
Proceed to put the boiler into operation as follows:
CHECK THE OPERATIONAL (WORKING)
GAS INLET PRESSURE
Set up the boiler to operate at maximum rate by
opening hot tap to maximum flow.
With the boiler operating in the maximum rate
condition check that the operational (working) gas
pressure at the inlet gas pressure test point complies
with the requirements - refer to “Gas Supply” on
page 10.
Ensure that this inlet pressure can be obtained with
all other gas appliances in the property working.
Safety
Drain
Valve
Black
Handle
Yellow
Handle
Black
Handle
Blue
Handle
CH Flow
DHW Outlet
Gas Supply
CH Return
DHW Inlet
Gas Pressure
Test Point
WARNING.
Whilst effecting the required gas tightness test and purging air from the gas installation,
open all windows and doors, extinguish naked lights and
DO NOT SMOKE.
A. Electrical Installation
1.
Checks to ensure electrical safety should be carried out by a
competent person.
2.
ALWAYS carry out the preliminary electrical system checks, i.e.
earth continuity, polarity, resistance to earth and short circuit,
using a suitable test meter.
3.
After wiring the boiler, all grommets in the bottom panel MUST
be in place to ensure that the boiler case sealing is maintained.
B. Gas Installation
1.
The whole of the gas installation, including the meter,
should be inspected and tested for tightness and purged in
accordance with the recommendations of BS. 6891.
In IE refer to IS.813:2002.
2.
Purge air from the gas installation by the approved
methods only.
ATTENTION !
IT IS A CONDITION OF THE MANUFACTURERS WARRANTY THAT THE
BENCHMARK COMMISSIONING CHECKLIST IS FULLY COMPLETED
AND LEFT WITH THE APPLIANCE
As part of the commissioning process, the combustion of this appliance must be checked
and the Benchmark Checklist completed. A flow chart to assist is provided on page 69.
INST
ALLA
TION
Summary of Contents for INDEPENDENT COMBI 24
Page 4: ...4 Installation and Servicing...
Page 6: ...6 Installation and Servicing...
Page 63: ...63 Installation and Servicing...
Page 64: ......
Page 70: ...70 Installation and Servicing...
Page 71: ...71 Installation and Servicing...