9
MSC-6KLP
Sep 2022
Lift Assembly
STEP 1
Carefully remove shipping packaging and brackets. Remove all components & parts. Position the
base plate on the ground. (Fig. 3)
Fig. 3 Fig. 4
STEP 2
Carefully stand the column upright, align the bolt holes and secure to base plate with bolts. (Fig.4)
STEP 3
Position the lifting frame to the front of the base plate. Then connect the lifting frame to carriage with
bolts. (Fig. 5)
Fig. 5 Fig. 6
STEP 4
Mount the hydraulic motor pump on the column with bolts and nuts. (Fig. 6)
Connect the hose fitting and hose from pump to cylinder. (Figs. 7, 8 & 9)
Fig. 7 Fig. 8 Fig. 9