13
Response FF80
- Installation
7
BOILER ASSEMBLY - Exploded View
INSTALLATION
30.
EMC filter.
39.
Boiler front panel.
40.
Sealing panel
43.
Tank cover assy.
59.
Turret clamp.
64.
Controls panel assy.
66.
Transformer.
22.
Pump.
24.
DHW Flow switch.
25.
Automatic air vent.
26.
Heat exchanger.
27.
Burner sensing pipe.
28.
Fan sensing pipe.
29.
Sensing pipe clamp.
9.
Boiler overheat 'stat.
10.
Water pressure switch.
15.
Pressure gauge.
17.
Fan assembly.
19.
Safety valve.
20.
DHW expansion vessel
21.
CH expansion vessel
LEGEND
1.
Main burner.
2.
Main burner injector.
2A.
Gas valve.
3.
Flame sensing electrode.
4.
Ignition electrode.
5.
Air pressure switch.
6.
PCB 37.
7.
PCB 38.