14
Response FF80
- Installation
INSTALLATION
8
UNPACKING
INST
ALLA
TION
9
PACKAGING AND FRONT PANEL REMOVAL
Pack B Contents
z
Terminal grille assembly
z
No.8 x 8mm self tapping screw - 3 off
z
Flue support cutting aid - 1 off
z
Terminal wall plate - 1 off
z
90
0
Elbow Kit
z
Powered Vertical
flue Kit
Optional extras, if ordered, are available in separate boxes.
z
Programmer Kit
z
Roof Flue Kit
z
Extension Duct Kit D
Pack A Contents
z
The boiler
z
These Installation & Servicing Instructions
z
The User's Instructions
z
Wall mounting template
z
Wall mounting frame
z
1 pair stand-off channels (optional use)
z
Flue turret
z
Clamping and sealing ring
z
Mains connector assy.
z
Hardware Pack
The boiler is supplied fully assembled in one Pack A, together
with a standard flue assembly for lengths up to 600mm, rear or
side flue outlet, in Pack B.
Unpack and check the contents.
Hardware Pack
z
M6 x 10 Pp. Hd. screw - 4 off
z
1/2" x 15mm copper connector - 1 off
z
No.14 x 2" slotted Rd. Hd. screw - 6 off
z
No.10 x 2" slotted Rd. Hd. screw - 4 off
z
Wall plug (brown) - 10 off
z
Press. relief valve drain pipe - 1 off
z
Pressure relief valve nut - 1 off
z
22mm pipe connector - 2 off
z
15mm pipe connector - 3 off
z
22mm x 15mm reducing coupling - 1 off
z
DHW filter - 1 off
z
22mm compression nut - 2 off
z
15mm compression nut - 2 off
z
22mm olive - 2 off
z
15mm olive - 3 off
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
z
22mm 'O' ring - 2 off (spare items for CH/
z
15mm 'O' ring - 1 off
DHW connectors)
1.
Remove the lid.
2.
The top tray contains:
z
Flue turret
z
Mounting frame
z
Hardware pack
z
Stand-off channels
z
Wall mounting template
z
Installation instructions
These contents can be removed, leaving the boiler in its protective package.