10. Hold the thermostat
approximately 2
metres away from
the boiler and
“CONNECTING TO
BOILER” will be
displayed on your
screen.
11. After approximately
60 seconds “Set
System Time” will be
displayed on your
screen. Use up and
down arrows to set
the time. Once time is
set press “DONE”
12. “Set System Date” will
be displayed on your
screen. Use up and
down arrows to set
the date. Once date is
set press “DONE”.
QUICK START GUIDE
Logic Combi
In the unlikely event that commissioning is unsuccessful (e.g. central heating
will not switch on or will not switch off), electrically isolate the boiler,
remove 1 battery and repeat from step 8.
Blanking
Plate
Transceiver
INSTALLATION
For User & Installation Guide please visit www.idealboilers.com
IMPORTANT: This product MUST be installed by a Gas Safe Registered Engineer
1. Isolate electrical power to the
boiler.
2. Remove boiler front panel.
3. Remove the blanking plate.
4. Remove link wire plug & keep in
a safe place.
5. Connect the transceiver
electrical plug.
6. Locate and push the transceiver
assembly into the boiler.
7. Re-fit the boiler front panel
8. Insert only 3 batteries into the
Thermostat.
9. Turn electrical power back on
to the boiler and immediately
insert the fourth battery into the
Thermostat.