Center Punch Clamp Production Tool
Installing BAND-IT® Center Punch Clamps with the SM1700:
1.
Choose the correct material type and diameter clamp to best satisfy the needs of
the application.
2.
Place Center Punch clamps over hose, then install fitting. The buckles of each
clamp should be located opposite of each other to increase resistance to leak
paths.
3.
Insert clamp tail fully into blade assembly with buckle on top.
4.
Hold assembly securely with both hands.
Keep fingers and loose clothing away
from clamp being applied!
5.
Depress toe end of foot pedal control to tension clamp. Keep toe end down until
clamp has been fully tensioned, locked, and cut-off is complete.
6.
Depress heel end of foot pedal and retrieve clamp tail from tool head.
Clamp tail inserted into blade
assembly before clamping
Tool position prior to
clamp lock and cut-off
Tool position prior to
scrap tail removal
For further product information, download instruction manual at
www.band-it-idex.com/products_tools.asp or contact a Product Specialist at 800-525-0758.