background image

Center Punch Clamp Production Tool 

Installing BAND-IT® Center Punch Clamps with the SM1700:

1.

Choose the correct material type and diameter clamp to best satisfy the needs of 
the application.

2.

Place Center Punch clamps over hose, then install fitting. The buckles of each 
clamp should be located opposite of each other to increase resistance to leak 
paths. 

3.

Insert clamp tail fully into blade assembly with buckle on top.

4.

Hold assembly securely with both hands. 

Keep fingers and loose clothing away 

from clamp being applied!

5.

Depress toe end of foot pedal control to tension clamp.  Keep toe end down until 
clamp has been fully tensioned, locked, and cut-off is complete.

6.

Depress heel end of foot pedal and retrieve clamp tail from tool head.

Clamp tail inserted into blade 
assembly before clamping

Tool position prior to 
clamp lock and cut-off

Tool position prior to 
scrap tail removal

For further product information, download instruction manual at 

www.band-it-idex.com/products_tools.asp or contact a Product Specialist at 800-525-0758.

Reviews: