5
FIRST ArcSAR SETUP
IDS GeoRadar S.r.l.
Confidential Information - Do Not Distribute
MNG/2017/0016 Rev 1.0 51/ 78
Fig. 106 – Fuel filter cleaning
Fig. 107 – Fuel filter
Check if the red switch placed under the black button is on
I
position.
5.13
Turning on the system
Turn the red switch on and push the Enable switch (
). With this
actions, the Power, Control and Green modules will be supplied (the
Module On LED has to be lit up).
Fig. 108 – Turning on the system
5.14
Green module first setup
Follow the steps below to properly turn on the solar panels and/or the wind
turbine.
Turn on the BATTERY toggle switch (
) to allow the power
generated by the green sources to flow to the ArcSAR batteries.