IDT SMBus Interfaces
Slave SMBus Interface
PES12N3 User Manual
7 - 10
June 7, 2006
Notes
The FUNCTION field in the command code indicates if the SMBus operation is a CSR register read/
write or a serial EEPROM read/write operation. Since the format of these transactions is different. They will
be described individually in the following sections.
If a command is issued while one is already in progress or if the slave is unable to supply data associ-
ated with a command, then the command is NACKed. This indicates to the master that the transaction
should be retried.
CSR Register Read or Write Operation
Table 7.9 indicates the sequence of data as it is presented on the slave SMBus following the byte
address of the Slave SMBus interface.
Bit
Field
Name
Description
0
END
End of transaction indicator. Setting both START and END signifies a
single transaction sequence
0 - Current transaction is not the last read or write sequence.
1 - Current transaction is the last read or write sequence.
1
START
Start of transaction indicator. Setting both START and END signifies
a single transaction sequence
0 - Current transaction is not the first of a read or write sequence.
1 - Current transaction is the first of a read or write sequence.
4:2
FUNCTION
This field encodes the type of SMBus operation.
0 - CSR register read or write operation
1 - Serial EEPROM read or write operation
2 through 7 - Reserved
6:5
SIZE
This field encodes the data size of the SMBus transaction.
0 - Byte
1 - Word
2 - Block
3 - Reserved
7
PEC
This bit controls whether packet error checking is enabled for the cur-
rent SMBus transaction.
0 - Packet error checking disabled for the current SMBus transaction.
1 - Packet error checking enabled for the current SMBus transaction.
Table 7.8 Slave SMBus Command Code Fields
Summary of Contents for 89HPES12N3
Page 10: ...IDT Table of Contents PES12N3 User Manual iv June 7 2006 Notes...
Page 14: ...IDT List of Figures PES12N3 User Manual viii June 7 2006 Notes...
Page 36: ...IDT Clocking Reset and Initialization Reset PES12N3 User Manual 2 8 June 7 2006 Notes...
Page 40: ...IDT Link Operation Slot Power Limit Support PES12N3 User Manual 3 4 June 7 2006 Notes...
Page 50: ...IDT Switch Operation Switch Core Errors PES12N3 User Manual 4 10 June 7 2006 Notes...
Page 54: ...IDT Power Management Active State Power Management PES12N3 User Manual 5 4 June 7 2006 Notes...
Page 62: ...IDT Hot Plug and Hot Swap Hot Swap PES12N3 User Manual 6 8 June 7 2006 Notes...
Page 78: ...IDT SMBus Interfaces Slave SMBus Interface PES12N3 User Manual 7 16 June 7 2006 Notes...
Page 148: ...IDT Test and Debug SerDes Test Clock PES12N3 User Manual 10 6 June 7 2006...
Page 158: ...IDT JTAG Boundary Scan Usage Considerations PES12N3 User Manual 11 10 June 7 2006 Notes...