2. PCI Interface
58
PowerSpan II User Manual
80A1010_MA001_09
Integrated Device Technology
www.idt.com
Figure 8: Hot Swap Insertion
2.4.6
Hot Swap Extraction Process
Use the application illustrated in
as a point of reference in the Hot Swap extraction process
outlined below.
1.
Ejector switch opens
— The Extraction (EXT) bit in the P1_HS_CSR register is set, causing the assertion of ENUM#
2.
Compact PCI Host:
— Reads the P1_HS_CSR of each agent to determine which card is being extracted
— Clears the PowerSpan II EXT bit. This causes the negation of ENUM# and arms the INS bit
— Places the card in a software dormant state
— Sets the LED On/Off (LOO) bit in the P1_HS_CSR register. This causes the assertion of
LED# which turns the light emitting diode to signal the operator
3.
Operator begins extracting the card.
At this point the operator can close the ejector switch and reenter the insertion process.
EXT bit
INS bit
LED
ENUM#
Ejector State
PCI Signals
PCI Clock
PCI RST#
HEALTHY#
BD_SEL#
Back End Power
Early Power
Med
Engage
Short
Engage
Fully
Seated
Clocking
Closed
Open
Engaged, tracking bus
Cleared/Unarmed
Cleared/Armed
LED off
Cleared/Unarmed
Set
Cleared/Unarmed
Physical Connection
Hardware Connection
Start of Software Connection Process
LED on
pre-charge
Pulled up
Long
Engage
Back-End Powered
Board goes Healthy
(from J1)
pre-charge
pre-charge
pre-charge
Clears
LOO bit
Ejector
Latched