Innovative DisplayWorks
G-10f/GCG-10f
6
PREPARATION PRIOR TO OPERATION
•
Remove all packaging materials before using cooler.
This includes: foam pedestal, adhesive tape (used to fix accessories) and protective gaskets.
•
Inspect cooler for concealed damage. Immediately file a claim with the freight carrier if there is damage.
IDW is not responsible for damage incurred during shipping.
•
For proper operation, place the cooler on a dry, level surface.
•
Clean the interior surface with a soft cloth and lukewarm water before operation.
•
Keep cooler in an upright position for 30 minutes prior to use.
•
IDW requires that a sole use circuit be dedicated for the unit. Failure to do so voids warranty.
WARNING: Do not use extension cords.
WARNING: Compressor warranties are void if compressor burns out due to low voltage.
WARNING: Power supply cord should not be removed or altered in any way.
Leveling
•
Set unit in its final location, making certain there is adequate ventilation in the room.
WARNING: Warranty is void if ventilation is insufficient.
•
Proper leveling of the G-10f/GCG-10f cooler is critical to it operating correctly. Condensation removal and
door operation will be affected by leveling.
<
The cooler should be leveled front to back and side to side with a level.
•
Ensure that drain hose or hoses are positioned in the pan.
•
Remove plug and cord from inside the lower rear of the cooler.
•
The unit should be placed close enough to the electrical supply so that extension cords are never used.
Shelving Installation
• Securely insert shelf clips into pilasters
• Shelf clips should be level so shelf lays fl at
•
Place shelf on shelf clips
(Maximum load per shelf is 30kg )
Display refrigerators can be loaded within the shelf dimensions from the front to back side.
They can also be loaded in any space from the bottom to the top interior cabinet.
Do not allow product to block the evaporator fan cover because the evaporator fan
helps the cooler to ventilate properly.