Innovative DisplayWorks
G-77
5
LEVELING/LOCATION
• Place unit in a well-ventilated area.
• WARNING: Warranty is void if ventilation is insufficient.
• Unit must be leveled for proper operation, this will help prevent condensation.
• The cooler should be leveled front to back and side to side with a leveler.
INSTALLATION AND OPERATION
• Connect the Power Source. After 30 minutes of operation, the unit should show signs of cooling.
• After the empty cooler has been operating for a period of 5 hours, the unit can be loaded with products.
CLAMP INSTALLATION
The clamp secures the lid assembly to the main body of the cabinet
1
Locate the (2) notches on the interior of the lid
2
Snap the (2) bolts into the notches of the lid.
3
Screw the clamps onto the
bolts.
4
Hook the two clamps onto the center bar of the
basket.