1.8KW Router User Manual
2
4.3.
Electric and air circuit
Make sure correct router cable, control cable, air tube connect before test run.
Water cooler: Circulate cooling water inside 1.8kw through inlet and outlet
pipes
4.4.
Check router cable
Check router power, controller,( shown in image 1)
(
image 1
)
4.5.
Check control cable
Run testmillingcutter.exe, click START button. Control cable is good if spindle
running, if not, check the connectors.
4.6.
Check air circuit.
Main air pressure: 0.8Mpa.
Air pressure for spindle collet: 0.8Mpa
Air pressure for Router bit library: 0.6Mpa
Air pressure for cooling: 0.1Mpa