of the equipment is biased towards the front end, the cross beam is usually moved to the rear end
for fixation.
Use lifting device: four lifting ring mounting holes are provided on both sides of the equipment table to
facilitate lifting with lifting rings.
Two sleepers are installed at the bottom of the factory equipment, which can be directly placed on the
flat ground
。
2.1.2.
Disassembly and assembly of the cover
Before installation, remove 4 middle side covers on both sides. The middle side cover is fixed on
the machine with two 3M Velcro stickers on the left and right. Pull up the left and right sides of the
upper part of the middle side cover to separate the bonding surface, and then remove the middle side
cover
。
2.1.3.
Remove the packing batten
Remove the fixing bolts of the packing wooden strip with an 8mm wrench, lift the equipment and take