4 - HANDLING AND INSTALLATION
SIR 52 MS52 P/F
EN
4 - Pag. 7 / 22
4.4 INSTALLATION
The most important phase of installation is the alignment between the bar feeder and lathe,
hence said operation shall be carried out by skilled personnel with the maximum precision.
WARNING-CAUTION:
A wrong alignment may be the main cause of bar feeder malfunctioning and may
cause damages to the machine.
4.4.1 Preliminary
operations
- Check lathe spindles (A) levelling; adjust lathe levelling, if necessary.
Summary of Contents for SIR52 MS52 P
Page 2: ......
Page 4: ......
Page 6: ......
Page 20: ...EN 2 TECHNICAL INFORMATION SIR 52 MS52 P F 2 Pag 10 14 2 6 TECHNICAL INFORMATION...
Page 24: ...EN 2 TECHNICAL INFORMATION SIR 52 MS52 P F 2 Pag 14 14...
Page 50: ...EN 4 HANDLING AND INSTALLATION SIR 52 MS52 P F 4 Pag 22 22...
Page 72: ...EN 5 ADJUSTMENTS AND SETTING UP SIR 52 MS52 P F 5 Pag 22 22...
Page 102: ...EN 6 USE AND OPERATION SIR 52 MS52 P F 6 Pag 30 30...
Page 148: ...EN 9 PART REPLACEMENT SIR 52 MS52 P F 9 Pag 16 16...
Page 174: ...EN 11 GUIDE CHANNELS BAR PUSHER REVOLVING TIPS SIR 52 MS52 P F 11 Pag 6 6...
Page 185: ...12 GRIPPERS SIR 52 MS52 P F EN 12 Pag 11 34...
Page 203: ...12 GRIPPERS SIR 52 MS52 P F EN 12 Pag 29 34...
Page 212: ...EN 13 LIST OF AFTER SALES CENTERS SIR 52 MS52 P F 13 Pag 4 4...