PNG3XX INSTALLATION MANUAL
NAM-PNG3xx-TM-EN-C.doc
The info rmation contained in this d ocu ment is the p roperty of Auto matic
Syste ms and is co nfidentia l. The re cipient shall refrain fro m using it fo r a ny
purpose other than the use of the pro ducts or the execu tion of the pro ject to
which it refers and fro m co mmunicating it to third partie s without written p rio r
agree ment of Auto matic Syste ms. Do cu ment sub ject to change without notice.
2
Table of contents
1. IMPORTANT INFORMATION ..........................................................................................................................................6
1.1 Direction Names and Conventions ..................................................................................................... 7
1.2 Before You Begin – Required Objects ................................................................................................ 7
1.3 Required Cables or Conduits ............................................................................................................. 8
1.4 U.L. (Underwriters Laboratories) Notes .............................................................................................. 9
1.5 Installation Notes – Measurements .................................................................................................. 10
1.6 Baseplates ...................................................................................................................................... 11
1.7 Emergency Opening ........................................................................................................................ 13
2. INSTALLATION..............................................................................................................................................................14
2.1 Move and Unpack Equipment .......................................................................................................... 14
2.2 Equipment Zones (locations) and Conventions................................................................................. 15
2.2.1 Conventions and Locations ....................................................................................................... 15
2.2.2 Location MF (Master Front): ...................................................................................................... 16
2.2.3 Location MR (Master Rear): ...................................................................................................... 17
2.2.4 Location SR (Slave-Rear):......................................................................................................... 18
2.3 Preliminary Site Work ...................................................................................................................... 19
2.4 Installing the Unit ............................................................................................................................ 22
2.5 Electrical Connections ..................................................................................................................... 25
2.5.1 Power Requirements ................................................................................................................. 25
2.6 Installation Wiring ........................................................................................................................... 26
2.6.1 Master (Right) Unit .................................................................................................................... 26
2.6.2 Intermediate Unit – Master Side ................................................................................................ 26
2.6.3 Intermediate Unit – Slave Side .................................................................................................. 27
2.6.4 Slave (Left) Unit ........................................................................................................................ 27
2.7 AS1007 Board (Interface) ................................................................................................................ 28
2.8 Wiring Principle for One Lane: ......................................................................................................... 30
2.9 Wiring Principle for Multiple Lanes: ................................................................................................. 31
2.10 OPTIONS - Remote Control Panel (Remote Console)..................................................................... 32
3. START-UP......................................................................................................................................................................34
3.1 Final Adjustments ........................................................................................................................... 34
3.1.1 Detailed Calibration Method of Omron Type Photocells .............................................................. 34
3.1.2 Detailed Limit Switches Adjustment Procedure. ......................................................................... 37
3.2 Check List....................................................................................................................................... 40
3.3 Troubleshooting .............................................................................................................................. 40