10
5.3 Mounting position
• Permitted mounting positions: pipe length vertical, any position (fig� 1, 2), pipe
length horizontal, unit vertical (fig� 3, 5), unit on side, pipe length left (fig� 4)�
• Avoid the mounting position shown in fig� 6 (unit on side, pipe length right)� If
the flow rate is low, the specified measurement accuracy cannot be adhered to�
1
2
3
4
5
6