DP2402
Pulse stretcher
12
6.1 Mounting the connector
To achieve the protection rating indicated in the data sheet, the following has to be observed:
u
Use IO-Link cable with IP class.
u
Use M12 connectors with gold-plated contacts.
u
Connect the connector with the unit. The arrow indicates the position of the coding.
u
Carry out the fitting according to the indications of the cable manufacturer.
•
Maximum tightening torque on the connector side
➀
: 1.8 Nm
•
Maximum tightening torque o the socket side
➁
: 1.3 ±0.1 Nm
6.2 Removing the connector
u
Press the connector against the unit and simultaneously loosen the coupling nut.
6.3 Cable length
•
Without IO-Link communication: 30 m on each side
•
With IO-Link communication: 20 m on the master side
u
Provide all input and output side cables with a strain relief approx. 200 mm behind the connectors.