04/2010
1.0
35 72
. 12
-
. 70
illus. 12
SP list page 70
– Closed
- Ventilation
– Open
!
,
,
.
6,5-
-
,
,
8-36
.
2 / , . . 1,2
36
.
Important!
Make sure that the amount of petrol is
sufficient for the intended period of fogging.
The content of the standard solution tank is
6,5 liter, which is fogged according to the
size of the dosage nozzle between 8 and
36 minutes. The unit runs about 36
minutes w ith a full fuel tank (1,2l).
3.
:
рабочего
,
.
„
“
(
. 13).
,
.
З
(
,
-
. 13).
,
«STOP».
,
.
3. Stopping the unit:
Turn lever of solution tap at first into
position VENTILATION. Lever is in
horizontal
position.
In
position
VENTILATION air is ventilated through the
solution line and through the fog solution
socket (illus. 13).
Wait until fog is no longer visible.
Now turn lever of solution tap into position
closed (illus. 13).
Push stop button at the carburettor down
into position STOP. The unit stops and no
explosions are audible (illus. 11 page 34).
Actuate air pump about 3–4 times and
press simultaneously starter button.
Summary of Contents for EVO 35
Page 30: ...04 2010 1 0 52 72 32 69 illus 32 SP list page 69 ...
Page 31: ...04 2010 1 0 63 72 ...
Page 32: ...04 2010 1 0 64 72 ...
Page 33: ...04 2010 1 0 65 72 ...
Page 34: ...04 2010 1 0 66 72 ...
Page 35: ...04 2010 1 0 67 72 ...
Page 36: ...04 2010 1 0 68 72 ...
Page 37: ...04 2010 1 0 69 72 ...
Page 38: ...04 2010 1 0 70 72 ...
Page 39: ...04 2010 1 0 71 72 ...
Page 40: ...04 2010 1 0 72 72 ...