P O W E R O N / O F F / R E B O O T
5
MRBP.424321.001G2 Version 1.0 15/06/2020
1
POWER ON/OFF/REBOOT
1.1
FIRST START/SET-UP
To power EMI-SSD-1M control on, after on-site mounting and/or new detectors connection
according to this UM, it is necessary to push the button
on the control unit keypad, the loading
window appears on the display:
After the loading, the following message appears on the display:
↑
NO CHANNELS ENGAGED!
12:50↓
This message means it is necessary to perform channels tuning and connection.
EMI-SSD-1M control unit settings complete list can be found in the guide sections:
-
«
SETTINGS
»;
-
«
INTERNAL CHANNELS SETTINGS
»;
-
«
EXTERNAL CHANNELS SETTINGS
»;
-
«
ARCHIVING MODE SETTINGS
».
At the first start default settings and methane channels configuration factory settings are
set, factory default settings and gas configurations are shown Appendix B and C.
Minimal settings array essential for internal channel connection:
- date and time selection;
- current loop connection diagram selection;
- target gas selection.
Minimal settings array essential for external channel connection:
- date and time selection;
- device model selection;
- enter network address;
- interface RS-485 port settings.
After successful channels connection,
«
MAIN OPERATION MODE
»
appears on the display.