12
Figure 7
NA13065S
•
Inspect the attachment mounting frame.
(See Inspecting The Attachment Mounting Frame on
Page 11)
•
Replace any parts that are damaged, bent, or
missing [Figure 7].
•
Keep all fasteners tight.
•
Look for cracked welds.
•
Contact your Ignite Attachments representative for
replacement parts.
•
Lubricate the wedges.
GUTTER BRUSH OPERATION (IF
EQUIPPED)
NOTE:
The gutter brush kits are available for the right
side of the sweeper.
Figure 8
C210206a
1.
Remove the retaining pin (Item 1)[Figure 8].
2.
Remove the transport pin (Item 2) [Figure 8].
Figure 9
C210207a
3.
Lower the gutter brush arm (Item 1) [Figure 9] into
the operating position.
4.
Reinstall the transport pin (Item 2) and the retaining
pin (Item 1) [Figure 9] back to the original position for