Safety Notice
i
Safety Notice
After the installation of the linking system completed, please power on all machines and reset
the Control Box to begin the operation.
If the Control Box itself or its program chips need to be replaced due to the break-down
during the operation, please power on and reset all machines after replacement.
If the game board breaks down during the operation and needs to be replaced, please reset it
before operation after replacement. (Note: the red tag on the game board is the reset switch.)
All non-function pins on DIP Switch should be set at OFF to avoid error.
Please adjust the voltage of game board between 5.0V
~
5.2V. (Note: the voltage can be
measured from the connection pins [golden finger].)
Summary of Contents for Diamond Progressive
Page 1: ......
Page 2: ......
Page 45: ...9 Selectable Games 43 Bonus Game 3 Late Night Kisses Double Game Last 5 hands ...
Page 63: ...M100US ...