background image

INNOVATIVE HEARTH PRODUCTS  •  KITS AND ACCESSORIES  •  BLOWER KIT (MODEL FBK-250)

4

NOTE: DIAGRAMS AND ILLUSTRATIONS NOT TO SCALE

120 VAC BLACK

NEUTRAL WHITE

GROUND GREEN

SPEED CONTROL MODULE

Plug Blower into Module and

Module into Top Receptacle.

Tab intact

NEUTRAL SIDE

OF RECEPTACLE

If any of the original wire as supplied must be replaced, it must be

replaced with type AWM 105 degree C - 14 gauge wire.

Green ground screw

RECEPTACLE

Red

Black

JUNCTION BOX

HOT  SIDE

OF RECEPTACLE

Field Wired
Factory Wired

BLOWER

120V, 60HZ, 1PH BLOWER CONTROL CIRCUIT WIRING

Blower Control Module

Control Knob

Module Securing Screw

VIEW B - MOUNTING CONTROL MODULE TO CABINET

Firebox Bottom Floor

Cabinet Bottom Panel

Wing Nut

Adjust Thermal Element Sensing Disk

 to Touch Bottom of FireBox Floor

Module Cabinet Base Tab

Blower Control Module

Control Knob

Module Securing Screw

Firebox Bottom Floor

Cabinet Bottom Panel

Wing Nut

Adjust Thermal Element Sensing Disk To Touch

Bracket On Bottom Of FireBox Sub-Floor

Module Cabinet Base Tab

Firebox Sub-Floor

VIEW A - MOUNTING CONTROL MODULE TO CABINET

Figure 10

Figure 9

14. 

Reinstall the bottom panel, louver assembly, access door, control 

compartment door, facade or Barrier that was removed prior to op-

eration. 

15. 

Restore the electrical power to the unit.

16. 

Start the fireplace by following the procedure indicated in the lighting 

instructions section of the Installation and Operation Instructions 

manual, supplied with the fireplace.

17. 

Check the start up and shutdown, and the running operation of the 

blower. Also check the variable speed feature of the speed control.

Direct-vent Units - The approximate blower start time is 15 minutes from 

main burner startup. The approximate blower shut off time is 10 minutes 

after main burner shut down.

B-Vent Units - The approximate blower start time is 20 minutes from 

main burner startup. The approximate blower shut off time is 20 

minutes after main burner shut down.

J-BOX WIRING

 CAUTION 

Ground lead must be connected to the green screw 

located on the junction box. Failure to do so will 

prevent the appliance from operating. The appli-

ance must be electrically grounded in accordance 

with local codes or, in the absence of local codes, 

the National Electrical Code, ANSI/NFPA 70—lat-

est edition (In Canada, the current CSA C22.1 Ca-

nadian Electrical Code).

Printed in U.S.A. © 2000 Innovative Hearth Products

P/N  750029M   Rev. H   10/2019

Innovative Hearth Products (IHP) reserves the right to make changes at any time, without 

notice, in design, materials, specifications, prices and the discontinuance of colors, styles 

and products. Consult your local distributor for fireplace code information.

1769 East Lawrence Street • Russellville, AL 35654

Reviews: