background image

Printed in U.S.A. © 2018 Innovative Hearth Products

P/N  900914-00  Rev. NC  08/2018

 WARNING 

 

Test all gas piping and connections for leaks after 

installing or servicing. Correct all leaks at once.

 

Never use an open flame to check for a leak. Apply a 

noncorrosive leak detection fluid to all joints. Bubbles 

forming show a leak. Correct all leaks at once.

2

IHP reserves the right to make changes at any time, without notice, in design, materials, specifica-

tions, prices and also to discontinue colors, styles and products. Consult your local distributor 

for fireplace code information.

REFRACTORY PANEL INSTALLATION 

IMPORTANT: Installation of refractory panels should 

be done after the fireplace is placed in a permanent 

location.

1.  Remove screen assemblies and all hardware components out of 

the firebox. 

2.  Make sure the bottom refractory panels is centered in the firebox 

and flush with the front of the fireplace. 

3.  Match the top and bottom of the refractory panels before install-

ing.

4.  Using one (1) of the refractory brackets and two (2) of the self 

tapping screws, install rear refractory panel, center bracket and 

screw it to the top of firebox, See Figure 2.

5.  Install the right and left refractory panels with the gas line knock-

outs orientated down toward the bottom refractory secure them 

with the remaining refractory brackets and self tapping screws.

6.  Install the items removed in step 1.

 

 WARNING

LIFTING HAZARD

SINGLE -PERSON LIFT COULD 

CAUSE INJURY.

USE ASSISTANCE WHEN MOVING 

OR LIFTING.

1769 East Lawrence Street • Russellville, AL  35654

Figure 2 - Refractory Panels Installed 

Retaining 

Bracket 

Rear 

Refractory 

Left 

Refractory 

Screw

f i r e - p a r t s . c o m

Reviews: