25
Never leave the tool running unattended
Don’t leave the tool until it has come to a complete stop.
Disconnect power
Unplug when not in use, before making adjustments, changing
parts, cleaning or working on the log splitter. Consult technical
manual before servicing.
Protect the environment
Take used oil to an authorized collection point or follow the stipu-
lations in the country where the log splitter is used. Do not dis-
charge oil into drains, soil or water.
Maintain the log splitter with care
Always clean the unit after each use. Keep the log splitter clean for
best and safest performance. Follow instructions for lubrication.
Inspect all hydraulic seals, hoses and couplers for leaks prior to
use. Control levers and power switch must be kept clean, dry and
free from oil and grease at all times.
Make the workshop childproof
Lock the shop. Store the log splitter away from children and others
not qualified to use it.
APPLICATION CONDITIONS
This log splitter is designed for operating under ambient temperatures b5
°
C and 40
°
C and
for installation at altitudes no more than 1000 m above mean sea level. The surrounding humidity
should be less than 50% at 40
°
C. It can be stored or transported under ambient temperatures be-
tween -25
°
C and 55
°
C.
ELECTRICAL REQUIREMENTS
With 3 phase 400 Volt / 50Hz motor, the log splitter should be connected to standard 400V+10% /
50Hz+1Hz. Electrical supply which has protection devices of under-voltage, over-voltage, over-
current as well as a residual current device (RCD) which maximum residual current rated at 0.03A.
The mains connection and extension cable must have 5 wires = 3P + N + PE (3/N/PE). The mains
connection must have maximum 16 A fuse. Electrical connection rubber cables must comply with
EN60245 which are always marked with symbol H 07 RN. Cables should be identified, as it is a
legal requirement.
UNPACKING
At least two people are required to unpack the log splitter package. Take the following steps to put
the log splitter on the ground by tipping every side of the carton by 45 degrees. Make sure to put
block (B) to support the log splitter package (A) at the point a little higher than the middle. The
other side of block (B) shall be against a steady object, such as a wall. Wedge (C) shall be arranged
under the tipped log splitter package (A) every step to avoid slipping. Then remove the carton off
the log splitter.