26
CONTENTS OF THE SHIPPING CONTAINER
SET UP AND PREPARATION FOR OPERATION
1.
Pull the spring pin (A) to remove the lock pin (B). Apply a thin coat of grease to both surfaces
of the control lever guard as illustrated. Insert the control lever and guard assy and make sure
the control lever end goes into the slot of the connection bracket (C). Lock the control lever and
guard assy down with the lock pin (B) and spring pin (A). Follow the same steps to install the
other control lever and guard assy on the other side.
2.
Three installation positions are available for the support table for different splitting lengths. At
every installation positions, lock down hooks (D) are available. Insert the support table in the
selected brackets (E) and turn the lock down hooks (D) on both sides by 90 degrees to lock the
support table down.
3.
Familiarize yourself with the controls and features of this log splitter in the illustrations.
A
B
C
A
Log splitter frame
1 set
B
Control lever and guard assy
2 sets
C
Removable support table
1 pc