4.2 Receiver
Make sure that the crane is stopped for the entire duration of the assembly process,
keep the work area free and wear protective clothing.
Park the crane and position stop-ends (if these are not available use appropriate
signs) at a suitable distance so that it is not hit by other cranes on the same runway.
Check the power-supply voltage and turn off the mains switch.
Find a suitable location for the receiver, away from any intense radioelectric disturbance
sources and install the receiver cabinet using 4 elastic absorbers (M8).
Figure 2
Receiver Box dimensions
The receiver must be placed free of shielding. Metal parts which could obstruct
reception of the radio signal must be avoid.
The way to connect the receiver box to the crane's electrical installations is using a cable
with a terminal multipin connector:
Note: See attached drilling pattern sheet.
RADS11 and RADF13 Users Manual ver0.4a.doc
KCI Hoists Corp. reserves the right to modify this information without prior notification.
Page 7 of 23