Selenio
TM
BNP User Guide, Release 3.7.1
196
- Rebooting the System
Rebooting the System
Any time you load a new software image, you must reboot the system. When a power cycle or reboot is
performed, the BNP will retain previously saved configuration settings. Only the parameters of newly
introduced features need to be set when the system is upgraded and rebooted.
You can reboot the BNP either by using a power cycle or by using the reboot option from the BNP
Element Manager
.
Rebooting the BNP
The BNP does not have a power switch. To power the unit down, disconnect the power cable from the
connector as described in your BNP installation guide.
A system reboot can be performed by Administrative or Operator user accounts.
Use the
Reboot
option from the
BNP Element Manager
. The system will prompt for your Administrative
or O
Menu Path
BNP
Element Manager
main menu -->
Maintenance
(Alt
m
)-->
Reboot
(Alt
b
)
perator password, and for confirmation of the reboot.
1.
At the
Password Verification
dialog, enter your
password and click
OK
.
2.
At the
Reboot
confirmation screen, click
Yes
to continue
or
No
to dismiss the dialog and to cancel the reboot.