For any further information please contact
IMEX UK on:
01530-835 598
Or visit our web-site at: www.imexceramic.co.uk
Step 6
The manufacturer reserves the right to make technical
modifications without prior notice.
Flush valve installation
flush valve base
“click”
a
b
c
d
a: Install the flush valve downwards into the
cistern body ( Mark
:
make sure the flush
valve bottom is aligned with flush valve
base. And please make sure flush valve is
installed in the shown direction during
installation. )
b: Press the flush valve until it clicks in the
correct position.
c: Re-install the lever.
d: Re-install the top glass cover.
12